Programme.
Day 1 · Tuesday 19 January · Masterclass, Leaders’ Boardroom and UAE AI POWER 50
Morning and afternoon sessions are closed-door. The evening is by invitation.
| Time | Session · Format | What it covers |
|---|---|---|
| Morning | AI Power Infrastructure MasterclassExclusive technical workshop · 25 participants · 4 hours | Designing, optimising and future-proofing power infrastructure for AI. View details: AI Power Infrastructure MasterclassA practical, closed-door masterclass for technical and functional leaders responsible for designing, operating and optimising the power infrastructure behind AI and data-centre facilities. Focus areas
Who should attend Data Centre Engineering, Electrical Engineering, Critical Facilities, Power Systems, MEP, Energy, Infrastructure, Facilities, BESS, UPS, Cooling, EPC and Mission-Critical Engineering leaders. Workshop outcome Participants will develop a practical framework for AI power planning, infrastructure resilience, efficiency and sustainability, benchmark approaches with peers, and work through a 100 MW AI campus scenario from grid connection to power distribution, storage, resilience and cooling. |
| Afternoon | AI Power Infrastructure Leaders’ BoardroomExclusive executive boardroom · By invitation only · 20–25 senior leaders · 2 hours | Powering the UAE’s AI economy: the 2030 infrastructure challenge. View details: AI Power Infrastructure Leaders’ BoardroomA closed-door strategic dialogue for senior leaders shaping the UAE’s energy, power, grid, data-centre and AI infrastructure landscape. Key discussion areas
Who should attend CEOs, Managing Directors, C-Suite executives, utility leaders, energy executives, data-centre leaders, hyperscaler executives, infrastructure developers, government authorities and investment leaders. Boardroom outcome A shared set of strategic priorities for powering the UAE’s AI economy, identifying the key infrastructure, investment and policy challenges that need to be addressed towards 2030. |
| Evening | UAE AI POWER 50Recognition & leadership dinner · By invitation · 50 recognised leaders | Celebrating the leaders powering the UAE’s AI economy. View details: UAE AI POWER 50A peer-led recognition platform celebrating 50 outstanding leaders shaping the power and infrastructure ecosystem behind the UAE’s AI economy. The evening
Recognition criteria Recognition is based on leadership, contribution, innovation and influence in advancing the UAE’s AI power and infrastructure ecosystem. No rankings. No 1st, 2nd or 3rd positions. 50 leaders. One ecosystem. One recognition. |
Day 2 · Wednesday 20 January · Conference Day
Morning
| Time | Session · Format | What it covers |
|---|---|---|
| 08:00 | Registration & networking | |
| 09:00 | The AI power imperativeOpening keynote | Preparing the UAE’s electricity infrastructure for the age of AI. |
| 09:25 | The infrastructure bottleneckStrategic panel | What could constrain the UAE’s AI expansion? The practical constraints that could influence the pace, location and scalability of major AI projects across the UAE. Key question: What needs to be solved today to ensure infrastructure does not become the constraint on the UAE’s AI ambitions? |
| 10:20 | When AI becomes an energy projectExecutive conversation · One-on-one | Rethinking power, infrastructure and responsibility at scale. A one-on-one conversation with a senior energy leader or an AI infrastructure leader. Key question: When AI infrastructure reaches power-project scale, what does it take to bring the power and the project together? |
| 10:30 | Partner session | |
| 11:00 | Networking break | |
| 11:30 | From power connection to computeTechnical panel | Engineering the final mile of AI power infrastructure. From HV/MV connection through substations, transformers, switchgear, protection, distribution, UPS and rack-level power: where technical risks, delays and power-quality challenges emerge between grid connection and first compute. |
| 12:15 | Powering the AI infrastructureSignature showcase · 3 × 15 minutes | 3 technologies. 3 real-world use cases. 1 infrastructure challenge. Use case 01 · Power Powering the AI campus Use case 02 · Infrastructure Making every megawatt count Use case 03 · Thermal Managing the AI heat load |
| 13:00 | Networking lunch |
Afternoon
| Time | Session · Format | What it covers |
|---|---|---|
| 14:00 | The clean power equationSustainability panel | Balancing AI growth, energy security and Net Zero. The practical pathways to lower-carbon AI power, including renewables, nuclear, storage, grid decarbonisation, PPAs, captive generation and clean-energy procurement. |
| 14:45 | Beyond backupStrategic deep dive | Can battery storage become a core part of the AI power architecture? Key question: Is BESS becoming an essential infrastructure asset for powering AI, rather than simply backup equipment? |
| 15:10 | Power to heatStrategic engineering panel | Why electrical and thermal infrastructure must be designed together. As AI power densities increase, every additional megawatt of electricity ultimately becomes a thermal-management challenge. Key question: When power density drives heat density, can electrical and thermal infrastructure still be planned separately? |
| 15:45 | Networking break | |
| 16:15 | The intelligent power layerTechnology spotlight | Using digital technologies to see, predict and optimise AI power infrastructure. How AI, digital twins, real-time power monitoring, predictive analytics and intelligent energy-management systems can monitor power quality, predict infrastructure constraints and optimise energy flows. |
| 16:40 | The power equationClosing fireside | Can the UAE power the next generation of AI? A forward-looking conversation with a senior energy and AI infrastructure leader on what the next phase of AI growth means for the UAE’s power system. |
| 17:10 | Closing remarks | |
| 18:00 | The 1-Gigawatt ChallengeClosing leaders’ roundtable · Invitation-only · 20–25 senior leaders · 60–75 minutes | Building the power architecture for the UAE’s next AI campus. What would it take to power a 1 GW AI campus in the UAE? 01 · Power Where will the 1 GW come from, and what generation mix can provide reliable capacity? 02 · Grid How can the grid, transmission, substations and connections accommodate an AI load of this scale? 03 · Resilience What architecture is required to ensure uninterrupted, high-quality power? 04 · Flexibility & efficiency Where do BESS, microgrids, intelligent energy management and demand optimisation fit? 05 · Thermal How should power and thermal infrastructure be integrated as the AI load scales? Roundtable output The UAE 1 GW AI Power Architecture. A live strategic blueprint developed by the participants, mapping Generation → Grid → Transmission → Substation → Storage → Critical Power → AI Load → Cooling. The final output can be developed into a post-event UAE 1 GW AI Power Architecture 2027 Industry Blueprint. |
Never more than four people on stage, including the chair. No parallel tracks. No exhibition.