
GRID TO CHIP Abu Dhabi
The people responsible for generation, grid connection, critical power and cooling, in one room.
19–20 January 2027 · Abu Dhabi · 300 places, allocated by review
Can the UAE power the next generation of AI?
AI infrastructure starts with megawatts: where they come from, how they connect, how they stay reliable, and how the heat leaves the building.
- Generation
- Grid
- Transmission
- Substation
- Power distribution
- Storage
- AI infrastructure
- Cooling
The whole chain, on one stage.
The room
The people building, powering and financing AI infrastructure.
- 300
- Places
- 22
- Industries in the room
- 8
- Functions
- 1
- Stage

Who is in the room
Power & grid
Generation · Utilities · Transmission & distribution · Renewables & nuclear
Electrical & storage
EPC & engineering · Transformers, switchgear & UPS · Energy storage & BESS · Microgrids
Data centres & compute
Data centres & colocation · Hyperscalers · AI & digital infrastructure · Cooling & thermal
Capital & government
Investment & infrastructure funds · Government & infrastructure authorities · Oil & gas & energy
How the summit works.
No exhibition floor. No product pitches. No parallel tracks.

01 — Masterclass
AI Power Infrastructure Masterclass
Practical and closed-door, with capped places.

02 — Boardroom
AI Power Infrastructure Leaders’ Boardroom
Closed-door executive discussion.

03 — The summit
Grid to Chip Abu Dhabi
One-stage programme. No parallel tracks.

04 — The challenge
The 1-Gigawatt Challenge
Invitation-only closing roundtable and live strategic blueprint.
Programme.
The decisions behind the infrastructure.
19–20 JanuaryAbu Dhabi

19 January
AI Power Infrastructure Masterclass
Leaders’ Boardroom
UAE AI POWER 50
20 January
The Conference
The 1-Gigawatt Challenge
Programme highlights
The AI power imperative
The infrastructure bottleneck
From power connection to compute
Beyond backup
Power to heat
The 1-Gigawatt Challenge

The 1-Gigawatt Challenge
The summit ends with a blueprint, not notes.
The 1-Gigawatt Challenge closes the summit. Senior leaders work through what 1 GW of AI load needs from the UAE grid.
UAE 1 GW AI Power Architecture
Built live.Shared with every delegate.
The challenge covers six dimensions
The power picture
Generation mix, grid capacity and the constraints shaping AI growth to 2030.
From connection to compute
Substations, transformers, switchgear, protection, UPS, energisation, and where projects slip.
Resilience and flexibility
UPS, BESS, backup power, microgrids and power quality.
The power-to-heat equation
Why electrical and thermal infrastructure must be designed together above 45°C.
A 1 GW architecture
Built live. Shared with every delegate.
A network that matters
Peers across utilities, grid, data centres, hyperscalers, engineering, cooling and investment.
The next move
300 places.One room.19–20 January 2027.
Places are allocated by review.Request your place for Abu Dhabi.
300PlacesAllocated by review