Six markets building AI capacity. One format.

SUMMITS · 2027

Every summit opens with a technical masterclass and a leaders’ boardroom, and closes with a leaders’ roundtable. No exhibition floor. No parallel tracks.

The 2027 summits.

Grid to Chip Abu Dhabi: a data centre campus with its substation, the Abu Dhabi skyline behind

Abu Dhabi · 19–20 January 2027

Power for AI Infrastructure

Regulators, utilities, grid operators and hyperscaler power teams deciding how AI infrastructure gets powered and connected.

Grid to Chip Riyadh: a data centre campus with its cooling plant, the Riyadh skyline behind

Riyadh · May 2027

Delivering AI Capacity at National Scale

Sovereign AI, telecom and industrial compute, built in one Kingdom at the same time, and the utilities that must power it.

Grid to Chip Malaysia: a hyperscale campus with the Kuala Lumpur skyline behind

Kuala Lumpur · September 2027

Power, Water and Data Centre Efficiency

For operators in a market where power, water and space are capped.

Every summit runs the same way.

  1. 01

    Technical Masterclass

    Practical and closed-door, with capped places.

  2. 02

    Leaders’ Boardroom

    Closed-door, by invitation.

  3. 03

    One-stage conference

    No parallel tracks, no vendor pitches.

  4. 04

    Closing leaders’ roundtable and Blueprint

    An invitation-only closing roundtable, and a live strategic blueprint built by its participants.

No exhibition floor · No product pitches · One stage.

The people building, powering and financing AI infrastructure.

  • GRID & ENERGY

    Regulators · utilities · transmission · generation

  • DATA CENTRES

    Operators · developers

  • NETWORK

    Telecom · interconnect

  • COMPUTE & AI

    Hyperscalers · AI companies · cloud · research

  • CAPITAL

    Sovereign funds · investors · lenders

Be first to hear when dates are confirmed.

We send dates and registration details as soon as each venue is confirmed.

Summits